WALLENSTAM AB

Repairs during late autumn 2008. Helicopter Lift brought great time savings.

In only 80 minutes all the material was strategically located on the roof.

Project: Wallenstam AB

Location/Town: Mölnlycke, Sweden

Product: UnoTech Plus FR