Repairs during late autumn 2008. Helicopter Lift brought great time savings.
In only 80 minutes all the material was strategically located on the roof.
Project: Wallenstam AB
Location/Town: Mölnlycke, Sweden
Product: UnoTech Plus FR
Repairs during late autumn 2008. Helicopter Lift brought great time savings.
In only 80 minutes all the material was strategically located on the roof.
Project: Wallenstam AB
Location/Town: Mölnlycke, Sweden
Product: UnoTech Plus FR
VÅRA STARKA VARUMÄRKEN SKYDDAR HEM, BYGGNADER OCH INFRASTRUKTUR